Beginning in the summer vacation months, The Beacon has had a major make-over.  Led by Don Harnden and our new director Mike Fuller, volunteers from the community and the Fellowship Church SERVE team helped to tear the old walls and ceiling down, move the office, and reposition  the overhead lights.  Don, in particular, spent much of the summer doing the building, drywalling, mudding and painting, plus he made the new cabinetry that was needed in our expanded and more accessible kitchen area.  KESA Painting, owned by Kevin Hakkesteegt and Luke VandenBosch, painted the revealed steel ceiling and joists with a tasteful grey coating. 
Welcome to the New Beacon youth centre.  Come and see the renovations and meet our new director, Mike Fuller.

 